Skip to main content

Commercial · A closer look

Builders Risk: Insuring a Building Under Construction

Nothing insures a structure during construction by default. Builders risk covers the work in progress, materials, and soft costs.

On this page

Builders risk insurance covers a building while it is under construction, and its two most consequential terms have nothing to do with the premium. The first is who is named as an insured, because more than one party usually has a financial interest in the project. The second is whether soft costs are included, because a covered loss that delays a project costs money beyond the physical repair.

A building under construction is not a finished building. The property policy that will cover it after completion does not yet apply, and the exposures during construction are different: materials stacked on site, a structure open to weather, work in progress by several trades, and a completion date that depends on everything going right.

What builders risk covers

Builders risk is property insurance for a structure during construction, written around the project rather than around an occupied building. The Texas Windstorm Insurance Association lists builders risk among the coverage options provided by endorsement to its forms, under the form numbers TWIA 18 and TWIA 21, described as applying to buildings or structures while in the course of construction. That is a coastal wind and hail association's version, but the structural description applies generally.

The coverage is typically written on a completed value basis, meaning the limit reflects the anticipated finished value of the project rather than its value on any given day during construction. That is the practical reason builders risk exists as a separate line: the insurable value rises as the building goes up, and a policy that tracked the daily value would be underinsured at the moment of a late-stage loss.

What it generally responds to is physical loss or damage to the covered construction from a covered cause of loss. What it does not do is cover the contractor's tools and equipment, which is the inland marine question, or the contractor's liability to third parties, which is the general liability question.

It is worth distinguishing builders risk from the construction-related coverage that a commercial property policy may already include. The Texas Department of Insurance's commercial property insurance guide describes newly acquired or constructed buildings coverage as insuring a new building if you add it to your policy, and notes that you usually must add the new building within 30 days after starting construction or acquiring it. That is a narrow add-on with a reporting deadline. A builders risk policy is a project policy written for the construction period, with a completed value limit and its own insured parties, which is a different instrument.

Who is insured, and why it is the first question

More than one party typically has a financial interest in a construction project. The owner has an interest in the completed building. The general contractor has an interest in the work in place and in its contract obligations. Subcontractors have an interest in their own work and materials. A lender may have an interest because the project secures a loan.

Builders risk is usually written so that the interests of the owner, the general contractor, and the subcontractors are covered under one policy, which is the point: one policy, one adjustment, rather than several policies each arguing about whose loss it is. Getting the named insureds right is what makes that work.

This is also where the most common and most expensive mistake sits. The construction contract says who is responsible for buying the insurance, and the parties then assume. The owner assumes the general contractor is buying it because the contractor sent a certificate. The contractor assumes the owner is buying it because the contract form allocates it that way. Nobody confirms, and the project has no coverage or has coverage that does not name the party that needed it.

The practical discipline is to read the insurance section of the construction contract before work starts, identify the party obligated to buy the property coverage, confirm the policy names every party with an insurable interest, and confirm the limits match the contract requirement. The certificates of insurance guide explains what a certificate does and does not prove, which is directly relevant here: a certificate shows that a policy existed, not that the project is properly insured.

Soft costs: the term that changes the claim

A covered loss does more than damage materials. It delays completion, and delay has a price.

Hard costs are the direct construction costs: materials, labor, and the physical work. Soft costs are the costs that continue or increase because the project is delayed: construction loan interest that accrues longer than planned, architectural and engineering fees for rework, additional permits and inspections, legal and accounting costs, taxes and insurance on the project during the extended period, and the cost of renegotiating leases or contracts.

The distinction matters because soft costs are not automatically included. A builders risk policy that covers only the physical damage leaves the owner bearing the cost of delay, and on a project financed with construction debt, that cost accrues daily.

If soft costs are included, they are usually subject to their own limit, often a sublimit within the overall policy. The terms also typically require that the soft costs result from a covered cause of loss and that the physical loss itself be covered. Some forms impose a waiting period or a deductible measured in days of delay before soft costs respond.

Ask specifically: are soft costs included, what is the sublimit, does a delay deductible apply, and which costs are listed as covered? A soft cost provision that lists interest and fees but not the owner's lost rental income is a different product from one that includes both.

Related to soft costs is the delay in completion or time element coverage, which addresses the income the completed project would have generated. For a building that will be rented, that is a distinct exposure from the cost of finishing construction.

Other terms worth checking

Term What it controls Question to ask
Completed value limit Whether the limit matches the finished project value Is the limit based on the anticipated completed value, and does it include soft costs or are they separate?
Policy term How long coverage runs Does the term match the construction schedule, and what happens if the project runs late?
Renovation versus new construction Whether an existing structure is covered If this is a renovation, is the existing building covered, or only the new work?
Flood and wind Whether storm losses are covered Are flood and wind included, and are separate deductibles or exclusions attached?
Occupancy and testing When coverage ends At what point does coverage stop: substantial completion, occupancy, or acceptance?
Insured parties Who is protected Are the owner, general contractor, and subcontractors all named or included as insureds?

Renovation is different from new construction. A builders risk policy written for new construction commonly excludes the existing structure being renovated, insuring only the work being added or changed. A renovation of an occupied building raises questions about the existing building, business interruption for the occupant, and how the new work interacts with the permanent property policy.

The end of the policy term is a real risk. Construction schedules slip. A policy written for a twelve month term on a project that runs fourteen months leaves a gap at the end, exactly when the building is most complete and most valuable. Ask how the policy handles an extension and whether the term can be extended before it expires.

Coastal wind is its own subject. In Texas, the Texas Windstorm Insurance Association is the residual windstorm market for designated coastal areas, and its eligibility rules require that the property be in the designated area, that the applicant have been denied coverage by at least one authorized insurer actively writing or renewing windstorm and hail coverage there, and that the structure be certified as built to applicable building codes. Those are specific program requirements rather than general builders risk rules, but they show why a coastal project needs a wind coverage conversation separate from the standard placement.

How builders risk fits with the rest of the program

Four lines interact on a construction project, and mixing them up is common.

  • Builders risk covers the structure under construction.
  • Inland marine covers the contractor's tools, equipment, and materials in transit or stored off site.
  • General liability covers third-party bodily injury and property damage claims arising from the work.
  • Workers' compensation covers injuries to the contractor's own employees.

A contractor who assumes the builders risk policy covers the tools on site will find the tools excluded. An owner who assumes the contractor's general liability covers the building under construction will find it does not. The lines are separate because the losses are different. If the project also requires a payment or performance guarantee, that is a bond rather than an insurance policy; the surety bonds guide explains the difference, including the fact that a bond obligates the principal to reimburse the surety rather than protecting the contractor.

What to bring to a builders risk review

A builders risk quote is driven by the project itself, so the information needs to describe it precisely.

  • The construction contract, especially the insurance section that allocates responsibility.
  • Project scope and type, distinguishing new construction from renovation or an addition.
  • The anticipated completed value, including whether soft costs are part of the limit or separate.
  • The construction schedule, so the policy term matches the expected duration.
  • The site, including whether it is in a coastal wind area or a flood zone.
  • The parties with an insurable interest, including the owner, lender, general contractor, and subcontractors.
  • Any contract insurance requirements, including required limits, named insureds, and endorsements.

Ask who will be named as an insured, what the completed value limit is based on, whether soft costs and delay coverage are included and at what sublimit, how the policy term handles a schedule overrun, and what happens at substantial completion. Those questions determine whether the policy responds to the loss that actually occurs.

For a commercial insurance review or a commercial quote, bring the construction contract, the project schedule, the completed value estimate, and the site details. Ask how the builders risk policy would coordinate with the contractor's liability and equipment coverage, and when the permanent property coverage should begin. NavaQuote writes commercial coverage in Arizona, Colorado, Georgia, Florida, North Carolina, South Carolina, and Texas, and the useful next step is settling who is insured and what the limit covers before the first load of materials arrives on site.

← Back to all guides

Your next step starts here.

Ready to protect your business?

Talk through your operation and the coverage worth comparing. Request a free, no-obligation commercial quote from Callie.

Get Your Free Quote